CALUMET- BENZENE CONVERSION PROJECT

Return to Case Studies
Piping & Specialized Mechanical Services
Superior, WI

A 14000 Manitowoc crawler crane lifting the fin-fan to it's final location on the top level of the new benzene conversion unit. 

Return to Case Studies